Connect with us

Calming

Gastra-FX

£30.00 – £110.00

The equine stomach contains powerful acids in order to break down and prepare food for absorption through the small intestine.  Over time and in certain circumstances the horses stomach lining can become inflamed and irritated due to several factors including diet, workload, living conditions and previous health conditions.  This discomfort can provoke avoidance behaviours to reduce the pain such as bucking, rearing, biting the girth area and performance issues.  Gastra FX works to soothe the acid and calm the inflammation thereby reducing the behaviours and allowing the horse to enjoy and focus on their work.   When used alongside Biotic 10 it will provide perfect end to end comfort for your horse’s gastrointestinal tract and promote long-term all-round health.

Also available as a handy to administer syringe for comfort on the go.  Check out Gastra FX syringe

Available in 1L and 4L sizes

SKU: N/A
Categories: ,
Brand:

Ingredients per 2 tablespoons (30ml)

COMPOSITION:

Purified water, Marshmallow root, licorice Root, Slippery Elm bark, Ginger Root, Apple Concentrate

ADDITIVES:

Emulsifying & Stabilising Agents, Thickeners & Gelling agents

  • Guar Gum E412 - 150mg

Preservatives:

  • Citric Acid E330 - 83mg
  • Potassium sorbate E202 - 75mg

ANALYTICAL CONSTITUENTS:

  • Crude protein - 0mg
  • Crude Fibre - 0mg
  • Crude oils and Fats - 0mg
  • Crude Ash - 0%
  • Moisture - 98%
  • Sodium - 12mg
  • Calcium - 0mg
  • Phosphorus - 0mg

Give 30ml TWICE daily and 60ml prior to an event or exercise if needed.

Place directly in the mouth for best results

Shake well before use.

Cautions: Not recommended for young pregnant or lactating mares.  Do not use if security seal is broken.

Storage: Refrigerate after opening.  Consume within 6 months of opening.  Keep container tightly closed when not in use

Allergens: Contains no corn, dairy, gluten, soy, wheat or yeast

Omega Alpha’s products are made from all natural human grade ingredients therefore product may have batch differences in colour and taste.

Weight N/A
Dimensions N/A
Weight

1L (Bottle Only), 1L (With Syringe), 4L (Bottle Only), 4L (With Pump)

Sign-Up To Our Newsletter!

We want to bring you the latest news and information from around the industry of key developments and breaking news however, at the moment we are working hard on getting our products out to you so bear with us and we will be getting up and running with a newsletter very soon.

If there is anything you’d like to see included, then please let us know. We love to bring educational and informative stories to you so please keep in touch and we’ll be online soon. We are happy for you to get in touch with us anytime and would love to hear from you.