Connect with us

Immunity

Immune Plus

£30.00 – £110.00

A highly effective blend of key botanicals designed to combat threats to the horses immune system on a daily basis. Most horses are well placed to fend off these threats but some horses due to age, illness or medication will find this harder to do. In order to resist and repel these threats, Immune Plus combines phytonutrients and trace elements with robust antioxidant properties. Ideal for use where horses are prone to allergies, chronic or reocurring infections, inflammatory issues and skin or coat problems.  Use for short periods as needed.

Available in 1L and 4L sizes

SKU: N/A
Category:
Brand:

Ingredients per 30ml

COMPOSITION:

Purified water, Astragalus Root, Echinacea Herb Top, Reishi Mushroom, Ashwagandha Root, Eleutherococcus Root, Apple Concentrate

ADDITIVES

Emulsifying & Stabilising agents, Thickeners & Gelling agents

  • Guar Gum E412 - 150mg

Preservatives:

  • Citric acid E330 - 30mg
  • Potassium sorbate E202 - 75mg

ANALYTICAL CONSTITUENTS:

  • Crude Protein - 0g
  • Crude Fibre - 0g
  • Crude oils and fats - 0g
  • Moisture - 98%
  • Sodium - 12mg
  • Calcium - 0mg
  • Phosphorus - 0mg
  • Magnesium - 0mg

Give 30ml once per day for 21 days.  Stop for 7 days and then repeat the cycle.

Place directly in the mouth for best results

Shake well before use.

Cautions: Not recommended for young pregnant or lactating mares.  Do not use if security seal is broken.

Storage: Refrigerate after opening.  Consume within 6 months of opening.  Keep container tightly closed when not in use

Allergens: Contains no corn, dairy, gluten, soy, wheat or yeast

Omega Alpha’s products are made from all natural human grade ingredients therefore product may have batch differences in colour and taste.

Weight N/A
Dimensions N/A
Weight

1L (Bottle Only), 1L (With Syringe), 4L (Bottle Only), 4L (With Pump)

Sign-Up To Our Newsletter!

We want to bring you the latest news and information from around the industry of key developments and breaking news however, at the moment we are working hard on getting our products out to you so bear with us and we will be getting up and running with a newsletter very soon.

If there is anything you’d like to see included, then please let us know. We love to bring educational and informative stories to you so please keep in touch and we’ll be online soon. We are happy for you to get in touch with us anytime and would love to hear from you.