Connect with us

Gastric Comfort

Gastra FX Ultra Paste

£15.00 – £18.00

Gut Health Formula on the go.  When situations occur whilst traveling that cause digestive discomfort reach for the handy, ready to administer syringe for fast relief.  Easy to carry, fast acting and entirely natural. For daily comfort and longer periods use Gastra FX daily to promote all round gastric health.

When used alongside Biotic 10 you can be sure that your horse’s gastrointestinal tract is happy and comfortable.

SKU: N/A
Category:
Brand:

Ingredients per 30ml:

COMPOSITION:

Purified water, Licorice Root, Marshmallow root, Slippery Elm bark, Magnesium Sulphate, Ginger Root, Apple Concentrate

ADDITIVES

Flavouring Compounds

  • Peppermint Oil - 36mg

Emulsifying & Stabilising agents, Thickeners & Gelling agents:

  • Guar Gum E412 - 150mg
  • Xanthan Gum E415 - 800mg

Preservatives:

  • Citric Acid E330 - 0.05%
  • Potassium sorbate E202 - 0.1%

ANALYTICAL CONSTITUENTS

  • Crude Protein - 0g
  • Crude fibre - 0.75g
  • Crude oils and fats - 0g
  • Crude Ash - 20%
  • Moisture - 80%
  • Sodium - 42mg
  • Calcium - 0mg
  • Phosphorus - 0mg
  • Magnesium - 2.44mg

Give 30-60ml, 15 minutes prior to tacking up.  Place directly into the mouth for best results.

Cautions: Not recommended for young pregnant or lactating mares.  Do not use if security seal is broken.

Storage: Consume immediately after opening

Allergens: Contains no corn, dairy, gluten, soy, wheat or yeast

Omega Alpha’s products are made from all natural human grade ingredients therefore product may have batch differences in colour and taste.

Weight N/A
Dimensions N/A
Options

Paste Only, Paste with Syringe (60ml)

Sign-Up To Our Newsletter!

We want to bring you the latest news and information from around the industry of key developments and breaking news however, at the moment we are working hard on getting our products out to you so bear with us and we will be getting up and running with a newsletter very soon.

If there is anything you’d like to see included, then please let us know. We love to bring educational and informative stories to you so please keep in touch and we’ll be online soon. We are happy for you to get in touch with us anytime and would love to hear from you.