Connect with us

Joints

Sinew-X +HA

£37.25 – £139.75

MSM Free.  A robust blend of 5 botanicals formulated to help support and maintain joint comfort.  Many conditions cause inflammation in the joint and tissues causing discomfort for the horse, so the botanicals contained in Sinew X + HA tackle the root cause of that discomfort whether that is age related or workload related. Hyaluronic Acid helps maintain healthy connective tissue and joint fluid which in turn enables the joints to function smoothly without pain.

Available in 1L and 4L

SKU: N/A
Categories: ,
Brand:

Ingredients per 2 tablespoons (30ml)

COMPOSITION:

Purified water, D-Glucosamine Sulphate, Hyaluronic acid, Licorice Root, Boswellia Resin, Notopterygium Root, Siler root, Turmeric Rhizome, Root of Gentiana

ADDITIVES:

Emulsifying & Stabilising agents, Thickeners & Gelling Agents

  • Guar Gum E412 - 150mg

Preservatives:

  • Citric Acid E330 - 0.05%
  • Potassium sorbate E202 - 0.1%

ANALYTICAL CONSTITUENTS:

  • Crude Protein - 0g
  • Crude Fibre - 0g
  • Crude oils and fats - 0g
  • Crude Ash - 0%
  • Moisture - 98%
  • Sodium - 12mg
  • Calcium - 0mg
  • Phosphorus - 0mg

Loading: Give 30ml TWICE a day for 7-10 days

Maintenance: Give 30ml a day

Place directly in the mouth for best results

Shake well before use.

Cautions: Not recommended for young pregnant or lactating mares.  Do not use if security seal is broken.

Storage: Refrigerate after opening.  Consume within 3 months of opening.  Keep container tightly closed when not in use

Allergens: Contains no corn, dairy, gluten, soy, wheat or yeast

Omega Alpha’s products are made from all natural human grade ingredients therefore product may have batch differences in colour and taste.

Weight N/A
Dimensions N/A
Weight

1L (Bottle Only), 1L (With Syringe), 4L (Bottle Only), 4L (With Pump)

Sign-Up To Our Newsletter!

We want to bring you the latest news and information from around the industry of key developments and breaking news however, at the moment we are working hard on getting our products out to you so bear with us and we will be getting up and running with a newsletter very soon.

If there is anything you’d like to see included, then please let us know. We love to bring educational and informative stories to you so please keep in touch and we’ll be online soon. We are happy for you to get in touch with us anytime and would love to hear from you.